Tension-leg platform
・ Tensione No. 2
・ Tensioner
・ Tensionless hitch
・ Tenskwatawa
・ Tensleep Creek
・ Tensleep Sandstone
・ Tensnake
・ Tenso
・ Tensoba
・ Tensobtenga
・ Tensobtenga Department
・ Tensoku Rock
・ Tensometer
・ Tenson (brand)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Tension-leg platform : ウィキペディア英語版
Tension-leg platform

__NOTOC__
A tension-leg platform (TLP) or extended tension leg platform (ETLP) is a vertically moored floating structure normally used for the offshore production of oil or gas, and is particularly suited for water depths greater than 300 metres (about 1000 ft) and less than 1500 metres (about 4900 ft). Use of tension-leg platforms has also been proposed for wind turbines.
The platform is permanently moored by means of tethers or tendons grouped at each of the structure's corners. A group of tethers is called a tension leg. A feature of the design of the tethers is that they have relatively high axial stiffness (low elasticity), such that virtually all vertical motion of the platform is eliminated. This allows the platform to have the production wellheads on deck (connected directly to the subsea wells by rigid risers), instead of on the seafloor. This allows a simpler well completion and gives better control over the production from the oil or gas reservoir, and easier access for downhole intervention operations.
TLPs have been in use since the early 1980s. The first tension leg platform〔(Reconversion d’une plate-forme offshore )〕 was built for Conoco's Hutton field in the North Sea in the early 1980s. The hull was built in the dry-dock at Highland Fabricator's Nigg yard in the north of Scotland, with the deck section built nearby at McDermott's yard at Ardersier. The two parts were mated in the Moray Firth in 1984.
The Hutton TLP was originally designed for a service life of 25 years in Nord Sea depth of 100 to 1000 metres. It had 16 tension legs. Its weight varied between 46,500 and 55,000 tons when moored to the seabed, but up to 61,580 tons when floating freely.〔 The total area of its living quarters was about 3,500 square metres and accommodated over a 100 cabins though only 40 people were necessary to maintain the structure in place.〔
The hull of the Hutton TLP has been separated from the topsides. Topsides have been redeployed to the Prirazlomnoye field in the Barents Sea, while the hull was reportedly sold to a project in the Gulf of Mexico (although the hull has been moored in Cromarty Firth since 2009).〔http://www.oilrig-photos.com/picture/number1709.asp〕
Larger TLPs will normally have a full drilling rig on the platform with which to drill and intervene on the wells. The smaller TLPs may have a workover rig, or in a few cases no production wellheads located on the platform at all.
The deepest (E)TLPs measured from the sea floor to the surface are:〔https://portal.mustangeng.com/pls/portal30/docs/FOLDER/MUSTANGENG/INDUSTRY_POSTERS_CONTENT/2007_07_DSRPOSTER.PDF〕
* Magnolia ETLP. Its total height is some .
* Marco Polo TLP
* Neptune TLP
* Kizomba A TLP
* Ursa TLP. Its height above surface is making a total height of .〔(Alexander's Gas & Oil Connections - Shell's Ursa deep water TLP begins production )〕
* Allegheny TLP
* W. Seno A TLP
==Use for wind turbines==
Although the Massachusetts Institute of Technology and the National Renewable Energy Laboratory explored the concept of TLPs for offshore wind turbines in September 2006, architects had studied the idea as early as 2003.〔 Earlier offshore wind turbines cost more to produce, stood on towers dug deep into the ocean floor, were only possible in depths of at most , and generated 1.5 megawatts for onshore units and 3.5 megawatts for conventional offshore setups. In contrast, TLP installation was calculated to cost a third as much. TLPs float, and researchers estimate they can operate in depths between 100 and and farther away from land, and they can generate 5.0 megawatts.〔(Floating Ocean Windmills Designed to Generate More Power )〕
TLPs are cost effective since they are assembled onshore and mobile. Paul Sclavounos, an MIT professor of mechanical engineering and naval architecture who was involved in the design, said, "You don't pay anything to be buoyant."〔
Computer simulations project that in a hurricane TLPs would shift three to six feet and the turbine blades would cycle above wave peaks. MIT and NREL researchers say dampers could be used to reduce motion in the event of a natural disaster.〔
MIT and NREL researchers plan to install a half-scale prototype south of Cape Cod. Sclavounos said, "We'd have a little unit sitting out there to show that this thing can float and behave the way we're saying it will."〔